BUFFINGTON 29-22N-1E #1SWD
API 3510324539 · Noble County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 149,280 | 488 |
| Nov 2025 | 144,096 | 485 |
| Oct 2025 | 154,836 | 11 |
| Sep 2025 | 134,604 | 353 |
| Aug 2025 | 156,327 | 352 |
| Jul 2025 | 141,820 | 347 |
| Jun 2025 | 148,826 | 341 |
| May 2025 | 144,550 | 8 |
| Apr 2025 | 149,020 | 10 |
| Mar 2025 | 149,382 | 340 |
| Feb 2025 | 130,374 | 338 |
| Jan 2025 | 154,210 | 11 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 0
STRAIGHT HOLEAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 9 5/8 | 40 | HCR-55 | 5,290 | 865 |
| CONDUCTOR | 20 | 94 | J-55 | 65 | 8 |
| SURFACE | 13 3/8 | 54.5 | J-55 | 445 | 350 |
Completion 1
STRAIGHT HOLEAC2DNCCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 9 5/8 | 40 | HCR-55 | 5,290 | 865 |
| CONDUCTOR | 20 | 94 | J-55 | 65 | 8 |
| SURFACE | 13 3/8 | 54.5 | J-55 | 445 | 350 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-06-18
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ARBUCKLE | 5,180 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.350070, -97.222240
Every well in Noble County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.