WILLIAMS #16-2
API 3510529840 · Nowata County, Oklahoma
Drilling permits
Oklahoma files 3 applications to drill this well, naming 27 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2002-02-07
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 580 |
| MULKY | 600 |
| IRON POST | 650 |
| CROWEBERG | 800 |
| WEIR-PITTSBURG | 900 |
| PRUE | 950 |
| BARTLESVILLE | 1,150 |
| ROWE COAL | 1,220 |
| RIVERTON | 1,250 |
| MISSISSIPPIAN | 1,300 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2002-02-07
WRAAMTarget formations
| Formation | Expected top (ft) |
|---|---|
| OSWEGO | 580 |
| MULKY | 600 |
| IRON POST | 650 |
| CROWEBERG | 800 |
| WEIR-PITTSBURG | 900 |
| PRUE | 950 |
| BARTLESVILLE | 1,150 |
| ROWE COAL | 1,220 |
| RIVERTON | 1,250 |
| MISSISSIPPIAN | 1,300 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2003-05-21
WRAAMTarget formations
| Formation | Expected top (ft) |
|---|---|
| SUMMIT | 625 |
| MULKY | 657 |
| IRON POST | 676 |
| BEVIER | 727 |
| WEIR-PITTSBURG | 865 |
| ROWE COAL | 1,138 |
| RIVERTON | 1,196 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.825483, -95.715505
Every well in Nowata County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.