D & G TAYLOR #10-2H
API 3510540574 · Nowata County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well. 2 carry a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| COAL (PENNSYLVANIAN) | GAS | 712–829 | Acid, Frac |
| BARTLESVILLE | OIL | 1,002–1,008 | Acid, Frac |
| ROWE COAL | GAS | 1,154–1,156 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-06-15 | 8 | 11 | 240 | — | 150 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | 9.5 | J-55 | 1,281 | 120 |
| SURFACE | 7 | 20 | J-55 | 40 | 20 |
Completion 2
STRAIGHT HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BIG LIME | OIL | 332–346 | Acid, Frac |
| COAL (PENNSYLVANIAN) | OIL | 712–829 | Acid, Frac |
| RED FORK | OIL | 846–854 | Acid, Frac |
| BARTLESVILLE | OIL | 1,002–1,018 | Acid, Frac |
| ROWE COAL | DRY | 1,154–1,156 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-12-05 | 9 | 22 | 140 | — | 20 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 7 | 20 | J-55 | 40 | 20 |
| PRODUCTION | 4.5 | 9.5 | J-55 | 1,281 | 120 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 11 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-07-10
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| PRUE | 678 |
| COAL (PENNSYLVANIAN) | 713 |
| OSWEGO | 750 |
| SKINNER | 778 |
| HIGGINSVILLE | 779 |
| RED FORK | 851 |
| BARTLESVILLE | 1,009 |
| ROWE COAL | 1,160 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2011-03-07
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| RED FORK | 849 |
| BARTLESVILLE | 997 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2012-09-05
WRARCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 324 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.656750, -95.790959
Every well in Nowata County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.