BLUE RIBBON #26-3
API 3510540598 · Nowata County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACDRYInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| RIVERTON | DRY | 1,448–1,452 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2009-03-06 | 0 | 0 | 60 | — | 420 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | J55 | 1,569 | 160 |
| SURFACE | 8 5/8 | 24 | LS | 122 | 65 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2008-10-17
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BIG LIME | 650 |
| OSWEGO | 865 |
| MULKY | 928 |
| COAL (PENNSYLVANIAN) | 950 |
| PRUE | 965 |
| BARTLESVILLE | 1,250 |
| ROWE COAL | 1,370 |
| RIVERTON COAL | 1,440 |
| MISSISSIPPI CHAT | 1,480 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.879431, -95.781806
Every well in Nowata County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.