UNUSSE 3 #3
API 3510701991 · Okfuskee County, Oklahoma
AC2RIn
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2RIn
Injection zone
BARTLESVILLE
Cumulative fluid injected
444 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 37 | 300 |
| Nov 2025 | 37 | 300 |
| Oct 2025 | 37 | 300 |
| Sep 2025 | 37 | 300 |
| Aug 2025 | 37 | 300 |
| Jul 2025 | 37 | 300 |
| Jun 2025 | 37 | 300 |
| May 2025 | 37 | 300 |
| Apr 2025 | 37 | 300 |
| Mar 2025 | 37 | 300 |
| Feb 2025 | 37 | 300 |
| Jan 2025 | 37 | 300 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 1
STRAIGHT HOLEAC2RInSpudded
1959-07-22
Drilling finished
1959-08-01
Completed
1959-08-25
Recompleted
1966-01-02
First production
1959-08-25
Total depth
3,815 ft
Operator
DAVID RIDLEY OIL LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| CROMWELL | INJ | 3,306–3,316 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 14 | UNKNOWN | 3,808 | 200 |
| SURFACE | 8.625 | 24 | UNKNOWN | 211 | 150 |
Completion 2
STRAIGHT HOLEAC2RInSpudded
1959-07-22
Drilling finished
1959-08-01
Completed
1959-08-25
Recompleted
1966-01-02
First production
1959-08-25
Total depth
3,815 ft
Operator
DAVID RIDLEY OIL LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| CROMWELL | INJ | 3,306–3,316 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 14 | UNKNOWN | 3,808 | 200 |
| LINER | 4.5 | — | — | 3,280 | 0 |
| SURFACE | 8.625 | 14 | UNKNOWN | 211 | 150 |
Location
35.518012, -96.338371
35.51801, -96.33837 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Okfuskee County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.