TURBEVILLE #1-33
API 3510723442 · Okfuskee County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLESIFORDERGASIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HUNTON | GAS | 3,820–3,872 | Acid |
| WILCOX | GAS | 4,020–4,464 | Acid |
| RAEGAN | GAS | 5,744–5,774 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-02-08 | 0 | 240 | 811 | — | 673 | OPEN |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | K55 | 5,953 | 700 |
| SURFACE | 9-5/8 | 36 | J-55 | 575 | 260 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 5 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-07-21
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CROMWELL | 3,238 |
| MISENER | 3,801 |
| HUNTON | 3,813 |
| WILCOX | 4,067 |
| REAGAN | 6,189 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.388438, -96.250342
Every well in Okfuskee County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.