CAPITOL HILL #16B-2
API 3510921569 · Oklahoma County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 22,775 | 0 |
| Nov 2025 | 23,400 | 0 |
| Oct 2025 | 23,100 | 0 |
| Sep 2025 | 14,108 | 0 |
| Aug 2025 | 4,825 | 4 |
| Jul 2025 | 2,561 | 0 |
| Jun 2025 | 8,644 | 250 |
| May 2025 | 10,619 | 249 |
| Apr 2025 | 12,954 | 205 |
| Mar 2025 | 12,193 | 193 |
| Feb 2025 | 15,486 | 111 |
| Jan 2025 | 8,183 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 3
DIRECTIONAL HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| PRUE | INJ | 7,327–7,480 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2024-06-25 | 0 | 0 | 1,007 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 7,553 | 208 |
| CONDUCTOR | 16 | 44 | — | 60 | 60 |
| SURFACE | 9 5/8 | 36 | J-55 | 1,760 | 705 |
Location
35.425679, -97.526625
Every well in Oklahoma County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.