GRANT CORBIN #2
API 3510936836 · Oklahoma County, Oklahoma
AC2DNC
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2DNC
Cumulative fluid injected
0 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 2
STRAIGHT HOLEAC2DNCSpudded
1949-11-14
Drilling finished
1949-12-19
Completed
1949-12-27
Recompleted
1988-06-14
First production
1949-12-27
Total depth
6,329 ft
Operator
SPESS OIL COMPANY INC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| CLEVELAND | INJ | 5,567–5,611 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 6,326 | 550 |
| LINER | 4 1/2 & 4 | 10.5 & 9.6 | J-55 | 5,683 | 50 |
| SURFACE | 9 5/8 | 36 | J-55 | 827 | 550 |
Completion 3
STRAIGHT HOLEAC2DNCSpudded
1949-11-14
Drilling finished
1949-12-19
Completed
1949-12-27
Recompleted
1988-06-14
First production
1949-12-27
Total depth
6,329 ft
Operator
SPESS OIL COMPANY INC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| CLEVELAND | DISP | 5,567–5,611 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 15.5 | J-55 | 5,680 | 50 |
| SURFACE | 9 5/8 | 36 | J-55 | 827 | 550 |
Location
35.543342, -97.436238
35.54334, -97.43624 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Oklahoma County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.