MONROE 1 #1S
API 3511127488 · Okmulgee County, Oklahoma
PANT
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEPANTSpudded
2015-10-11
Drilling finished
2015-10-19
Completed
2015-10-21
Total depth
3,330 ft
Operator
LANDSEER EXPLORATION LLC
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 16 | — | — | 60 | 0 |
| SURFACE | 9 5/8 | 36 | J-55 | 348 | 200 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2015-09-24
WRADRStraight holePermit API
35111274880000
Operator
LANDSEER EXPLORATION LLC
Well type
NT
Approved
2015-09-24
Expires
2016-03-24
Proposed depth
3,450 ft
Surface casing
350 ft
Ground elevation
637 ft
Target formations
| Formation | Expected top (ft) |
|---|---|
| RED FORK | 614 |
| BARTLESVILLE | 879 |
| CROMWELL | 2,320 |
| MISSISSIPPIAN | 2,771 |
| WOODFORD | 2,937 |
| SYLVAN | 2,980 |
| VIOLA | 3,022 |
| SIMPSON | 3,059 |
| ARBUCKLE | 3,312 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.535400, -95.976400
35.53540, -95.97640 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Okmulgee County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.