MULLENDORE #1-A
API 3511704435 · Pawnee County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1952-12-01
Drilling finished
1952-12-09
Completed
1953-02-25
First production
1953-02-26
Total depth
2,534 ft
Operator
CASEY MUSGROVE OIL COMPANY INC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| INOLA | OIL | 2,484–2,493 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2023-12-28 | 3 | 0 | 30 | 38 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 20 | — | 2,520 | 125 |
| LINER | 5 1/2 | 15.5 | K-55 | 2,458 | 140 |
| SURFACE | 10 3/4 | — | — | 117 | 100 |
Location
36.233305, -96.513083
36.23331, -96.51308 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Pawnee County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.