SCHOOL LAND #2
API 3511720983 · Pawnee County, Oklahoma
AC2DNC
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2DNC
Cumulative fluid injected
0 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 1
STRAIGHT HOLEAC2DNCSpudded
1980-11-04
Drilling finished
1980-11-09
Completed
1980-12-20
Recompleted
1982-11-18
First production
1980-12-20
Total depth
2,408 ft
Operator
SPESS OIL COMPANY INC
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BARTLESVILLE | DISP | 2,353–2,355 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | CW-55 | 2,389 | 235 |
| LINER | 2 7/8 | 6.5 | J-55 | 2,343 | 108 |
| SURFACE | 8 5/8 | 22 | — | 205 | 100 |
Completion 2
STRAIGHT HOLEAC2DNCSpudded
1980-11-04
Drilling finished
1980-11-09
Completed
1980-12-20
First production
1980-12-20
Total depth
2,408 ft
Operator
SPESS OIL COMPANY INC
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BARTLESVILLE | DISP | 2,353–2,355 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | CW-55 | 2,389 | 235 |
| LINER | 2 7/8 | 6.5 | J-55 | 2,343 | 108 |
| SURFACE | 8 5/8 | 22 | — | 205 | 100 |
Location
36.301459, -96.499921
36.30146, -96.49992 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Pawnee County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.