HAYMOND #3
API 3511901718 · Payne County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 6,000 | 0 |
| Nov 2025 | 6,000 | 0 |
| Oct 2025 | 6,000 | 0 |
| Sep 2025 | 6,000 | 0 |
| Aug 2025 | 6,000 | 0 |
| Jul 2025 | 6,000 | 0 |
| Jun 2025 | 6,000 | 0 |
| May 2025 | 6,000 | 0 |
| Apr 2025 | 6,000 | 0 |
| Mar 2025 | 6,000 | 0 |
| Feb 2025 | 5,600 | 0 |
| Jan 2025 | 6,000 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEAC2DNCIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| PRUE | DISP | 2,914–2,931 | Acid, Frac |
| RED FORK | DISP | 3,145–3,190 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1956-05-11 | 0 | 0 | 0 | — | 0 | — |
| 2007-11-28 | 0 | 0 | 145 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 15 | — | 3,146 | 150 |
| SURFACE | 10.75 | 32 | — | 299 | 160 |
Location
36.125788, -96.714691
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.