HOKE #13

API 3511904510 · Payne County, Oklahoma

ACOIL
API
3511904510
Operator
CIRCLE 9 RESOURCES LLC
County
Payne

Completion

Oklahoma files 1 completion report for this well. One carries a production test the operator filed.

Completion 1

STRAIGHT HOLEACOIL
Spudded
1917-09-26
Drilling finished
1918-01-18
Completed
1918-01-18
Recompleted
2011-10-10
First production
1918-01-18
Total depth
4,202 ft
Operator
CIRCLE 9 RESOURCES LLC

Interval

FormationProducedPerforated (ft)Treatment
SKINNEROIL3,090–3,108Acid, Frac

Production test

TestedOil (bbl/d)Gas (MCF/d)Water (bbl/d)Gravity (°API)Shut-in (psi)Choke
—20100—0—

A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
LINER5 3/16——14875
LINER5 1/215.5—2,995200
CONDUCTOR8——2,018125
SURFACE6 5/8——3,118150

Location

36.155367, -96.721445

36.15537, -96.72145 · Surface location as filed with Oklahoma

Every well in Payne County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.