WILLIAMS #1-33
API 3511921090 · Payne County, Oklahoma
AC2DNC
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2DNC
Cumulative fluid injected
42,800 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 6,200 | 0 |
| Nov 2025 | 6,000 | 0 |
| Oct 2025 | 6,200 | 0 |
| Sep 2025 | 6,000 | 0 |
| Aug 2025 | 6,200 | 0 |
| Jul 2025 | 6,200 | 0 |
| Jun 2025 | 6,000 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 3
STRAIGHT HOLEAC2DNCSpudded
1979-10-16
Drilling finished
1979-10-25
Completed
1979-12-26
Recompleted
2016-07-14
Total depth
4,327 ft
Operator
G & C PETROLEUM INC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| SKINNER | DISP | 3,000–3,005 |
| RED FORK | DISP | 3,150–3,160 |
| MISSISSIPPI | DISP | 3,502–3,508 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 20 | J-55 | 4,017 | 300 |
| SURFACE | 8 5/8 | 20 | X-52 | 612 | 400 |
Completion 4
STRAIGHT HOLEAC2DNCSpudded
1979-10-16
Drilling finished
1979-10-25
Completed
1979-12-26
Recompleted
2016-07-14
Total depth
4,327 ft
Operator
G & C PETROLEUM INC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| SKINNER | DISP | 3,000–3,005 |
| RED FORK | DISP | 3,150–3,160 |
| MISSISSIPPI | DISP | 3,502–3,528 |
| 2ND WILCOX | DRY | 3,680–3,696 |
| ARBUCKLE | DRY | 3,908–3,918 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 20 | J-55 | 4,017 | 300 |
| SURFACE | 8 5/8 | 20 | X-52 | 612 | 400 |
Location
36.076938, -96.772028
36.07694, -96.77203 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.