ROSIER #2
API 3511921096 · Payne County, Oklahoma
AC2DNC
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
Oklahoma well-type code
2DNC
Injection zone
SKINNER,RED FORK
Cumulative fluid injected
0 bbl
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 0 | 0 |
| Nov 2025 | 0 | 0 |
| Oct 2025 | 0 | 0 |
| Sep 2025 | 0 | 0 |
| Aug 2025 | 0 | 0 |
| Jul 2025 | 0 | 0 |
| Jun 2025 | 0 | 0 |
| May 2025 | 0 | 0 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 2
STRAIGHT HOLEAC2DNCSpudded
1979-10-02
Drilling finished
1979-10-09
Completed
1979-11-30
Recompleted
2004-03-29
Total depth
3,460 ft
Operator
FGS ENERGY LLC
Intervals
| Formation | Produced | Perforated (ft) |
|---|---|---|
| SKINNER | DISP | 3,046–3,050 |
| RED FORK | DISP | 3,125–3,140 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | — | — | 3,459 | 190 |
| SURFACE | 8 5/8 | — | — | 238 | 300 |
Location
36.154301, -96.684947
36.15430, -96.68495 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.