WILLIAMS #1-23
API 3511923696 · Payne County, Oklahoma
Completion
Oklahoma files 1 completion report for this well.
Completion 2
STRAIGHT HOLEACSWInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| PERMIAN | WATER SUPPLY | 1,086–1,151 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 11.6 | J55 | 1,960 | 255 |
| SURFACE | 8 5/8 | 24 | J55 | 683 | 420 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2004-01-20
WRADRTarget formation
| Formation | Expected top (ft) |
|---|---|
| VERTZ | 1,870 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2004-01-20
WRAAMTarget formation
| Formation | Expected top (ft) |
|---|---|
| VERTZ | 1,870 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2010-07-23
WRARCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| PERMIAN SD | 1,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.016988, -97.266230
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.