MOORE #3-15
API 3511923715 · Payne County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 2
STRAIGHT HOLEPAOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| PERU | OIL | 3,122–3,132 | Acid |
| PRUE | OIL | 3,390–3,396 | Acid |
| UPPER SKINNER | DRY | 3,551–3,555 | Acid |
| RED FORK | OIL | 3,614–3,618 | Acid |
| MISSISSIPPIAN | OIL | 3,866–3,880 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-05-13 | 5 | 5 | 2 | 39 | 75 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 3,949 | 225 |
| SURFACE | 8 5/8 | 24 | K-55 | 318 | 250 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 16 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2004-09-22
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| PERU | 3,100 |
| PRUE | 3,400 |
| SKINNER UP | 3,450 |
| SKINNER LOW | 3,550 |
| BARTLESVILLE | 3,800 |
| MISSISSIPPIAN | 3,900 |
| MISENER | 4,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2004-09-22
WRAAMTarget formations
| Formation | Expected top (ft) |
|---|---|
| PERU | 3,100 |
| PRUE | 3,400 |
| SKINNER UP | 3,450 |
| SKINNER LOW | 3,550 |
| RED FORK | 3,600 |
| BARTLESVILLE | 3,800 |
| MISSISSIPPIAN | 3,900 |
| MISENER | 4,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2011-03-08
WRARCStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPIAN | 3,850 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.039722, -96.858389
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.