CLINE #5
API 3511923879 · Payne County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BARTLESVILLE | OIL | 3,734–3,792 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2014-02-25 | 5 | 5 | 120 | 36 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | API | 4,140 | 425 |
| SURFACE | 8 5/8 | 23 | API | 170 | 135 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 7 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-06-08
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SKINNER | 3,514 |
| RED FORK | 3,568 |
| BARTLESVILLE | 3,670 |
| MISSISSIPPI LM | 3,820 |
| MISENER | 4,120 |
| WOODFORD | 4,175 |
| WILCOX | 4,210 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.024427, -96.890563
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.