HOLSTEIN SWD #3-22

API 3511923885 · Payne County, Oklahoma

AC2DNC
API
3511923885
Operator
ROBERSON OIL COMPANY INC
County
Payne

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2DNC
Injection zone
ELGIN|ENDICOTT|HOOVER|LOVELL
Cumulative fluid injected
121,400 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 20258,479200
Nov 20259,937200
Oct 20259,557200
Sep 20259,785200
Aug 20259,853200
Jul 202510,147200
Jun 20259,639200
May 20258,747200
Apr 20259,327200
Mar 202511,707200
Feb 202511,620200
Jan 202512,602200

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 0

STRAIGHT HOLEAC2DNC
Spudded
2011-11-01
Drilling finished
2011-11-03
Completed
2011-11-18
Total depth
2,260 ft
Operator
ROBERSON OIL COMPANY INC

Intervals

FormationProducedPerforated (ft)Treatment
LOVELLDISP1,548–1,600Acid
ENDICOTTDISP1,810–1,840Acid
ELGINDISP2,164–2,174Acid

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION726L / S2,250240
SURFACE9 5/836L / S572240

Drilling permit

Oklahoma files 1 application to drill this well, naming 4 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2011-09-07

WRADRStraight hole
Permit API
35119238850000
Operator
TRUEVINE OPERATING LLC
Well type
2DNC
Approved
2011-09-07
Expires
2012-03-07
Proposed depth
2,200 ft
Surface casing
525 ft
Ground elevation
958 ft

Target formations

FormationExpected top (ft)
HOOVER1,210
ELGIN1,450
ENDICOTT1,765
LOVELL2,100

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

36.115481, -96.976748

36.11548, -96.97675 · Surface location as filed with Oklahoma

Every well in Payne County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.