HINER #1
API 3511923889 · Payne County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| RED FORK | OIL | 3,575–3,584 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-04-22 | 2 | 35 | 40 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | — | 4,049 | 200 |
| SURFACE | 8 5/8 | 24 | — | 240 | 175 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-09-16
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| TONKAWA | 1,900 |
| TRUE LAYTON | 2,275 |
| CLEVELAND | 3,100 |
| PRUE | 3,375 |
| SKINNER UP | 3,550 |
| RED FORK | 3,610 |
| MISSISSIPPI | 3,830 |
| SIMPSON GP | 4,130 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.045804, -96.912345
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.