SCHARDEIN #5
API 3511923936 · Payne County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 5,801 | 420 |
| Nov 2025 | 5,622 | 420 |
| Oct 2025 | 3,733 | 410 |
| Sep 2025 | 13,157 | 430 |
| Aug 2025 | 12,103 | 430 |
| Jul 2025 | 11,289 | 420 |
| Jun 2025 | 9,488 | 420 |
| May 2025 | 7,912 | 410 |
| Apr 2025 | 8,528 | 415 |
| Mar 2025 | 13,647 | 410 |
| Feb 2025 | 12,843 | 420 |
| Jan 2025 | 10,190 | 410 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SKINNER LOW | OIL | 3,626–3,641 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-08-02 | 3 | 8 | 102 | 36 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 4,181 | 180 |
| SURFACE | 8 5/8 | 24 | J-55 | 451 | 260 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-03-22
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CHECKERBOARD | 3,120 |
| BIG LIME | 3,290 |
| OSWEGO | 3,330 |
| SKINNER LOW | 3,630 |
| PINK LM | 3,660 |
| RED FORK | 3,710 |
| MISSISSIPPI LM | 3,900 |
| MISENER | 4,130 |
| VIOLA | 4,140 |
| WILCOX | 4,210 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.244689, -96.902886
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.