MEHAN #3-14WH
API 3511924345 · Payne County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
HORIZONTAL HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| WOODFORD | OIL | 5,200–9,225 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2015-09-16 | 344 | 540 | 600 | 38 | 400 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 20 | P-110 | 9,328 | 1,255 |
| CONDUCTOR | 16 | — | — | 40 | 9 |
| SURFACE | 9 5/8 | 36 | J-55 | 548 | 217 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 4 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2015-06-12
WRADRHorizontal holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| MISSISSIPPIAN | 4,470 |
| WOODFORD | 4,610 |
| MISENER-HUNTON | 4,655 |
| SYLVAN | 4,660 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.028393, -97.063275
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.