JAMES #1-10
API 3511924446 · Payne County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| BARTLESVILLE | OIL | 4,466–4,476 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2021-11-04 | 96 | 140 | 0 | 38 | 980 | 18/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 5,012 | 165 |
| SURFACE | 8 5/8 | 24 | J-55 | 515 | 295 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2021-08-09
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| LAYTON | 3,374 |
| CLEVELAND | 3,750 |
| BIG LIME | 4,000 |
| RED FORK | 4,375 |
| BARTLESVILLE | 4,435 |
| VIOLA | 4,800 |
| WILCOX 1 | 4,860 |
| WILCOX 2 | 4,900 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
36.055202, -97.079865
Every well in Payne County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.