WILFONG "A" #2

API 3512303615 · Pontotoc County, Oklahoma

PAOIL
API
3512303615
Operator
HRC PRODUCTION CO
County
Pontotoc

Completion

Oklahoma files 1 completion report for this well.

Completion 1

STRAIGHT HOLEPAOIL
Spudded
1952-04-18
Drilling finished
1952-04-25
Completed
1952-05-07
Recompleted
2002-05-21
Total depth
1,642 ft
Operator
HRC PRODUCTION CO

Intervals

FormationProducedPerforated (ft)
WEWOKADRY1,274–1,372
CALVINDRY1,589–1,642

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
INTERMEDIATE8 5/832—1,624100
SURFACE1655—9090

Location

34.860144, -96.755410

34.86014, -96.75541 · Surface location as filed with Oklahoma

Every well in Pontotoc County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.