THOMSON #4
API 3512322956 · Pontotoc County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILSpudded
1985-08-01
Drilling finished
1985-08-13
Completed
1985-08-22
First production
1985-09-01
Total depth
1,350 ft
Operator
OKLAHOMA LIQUID RESOURCES INC
Interval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SENORA UP | OIL | 990–998 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1985-09-01 | 10 | 0 | 0 | 40 | 430 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 4 1/2 | 10.5 | J-55 | 1,122 | 290 |
| SURFACE | 8 5/8 | — | — | — | 10 |
Location
34.849166, -96.567584
34.84917, -96.56758 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Pontotoc County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.