EAST FITTS UNIT #14A2-B2
API 3512323659 · Pontotoc County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 2,746 | 1,500 |
| Nov 2025 | 2,741 | 1,500 |
| Oct 2025 | 2,866 | 1,500 |
| Sep 2025 | 2,698 | 1,500 |
| Aug 2025 | 2,756 | 1,500 |
| Jul 2025 | 2,647 | 1,500 |
| Jun 2025 | 2,250 | 1,500 |
| May 2025 | 2,259 | 1,500 |
| Apr 2025 | 2,512 | 1,500 |
| Mar 2025 | 2,668 | 1,500 |
| Feb 2025 | 2,442 | 1,500 |
| Jan 2025 | 2,490 | 1,500 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEAC2RInIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HUNTON | OIL | 3,673–3,714 | Acid, Frac |
| VIOLA | OIL | 4,197–4,301 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2011-02-27 | 60 | 0 | 219 | 39.3 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 16 | — | — | 40 | 0 |
| PRODUCTION | 5 1/2 | 17 | J-55 | 4,450 | 680 |
| SURFACE | 9 5/8 | 36 | J-55 | 667 | 225 |
Completion 2
STRAIGHT HOLEAC2RInIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HUNTON | INJ | 3,673–3,714 | Acid |
| VIOLA | INJ | 4,197–4,301 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 4,450 | 680 |
| CONDUCTOR | 16 | — | — | 40 | 9 |
| SURFACE | 9 5/8 | 36 | J-55 | 667 | 225 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 8 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2010-09-13
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CROMWELL | 2,933 |
| HUNTON | 3,632 |
| VIOLA | 4,128 |
| BROMIDE | 4,383 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2010-09-13
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CROMWELL | 2,933 |
| HUNTON | 3,632 |
| VIOLA | 4,128 |
| BROMIDE | 4,383 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.625649, -96.539341
Every well in Pontotoc County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.