TOOLEY(HUDSON) #1
API 3512501095 · Pottawatomie County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1960-08-02
Drilling finished
1960-08-13
Completed
1960-08-14
First production
1960-08-14
Total depth
3,579 ft
Operator
DAVID RIDLEY OIL LLC
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| EARLSBORO | OIL | 3,517–3,542 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1960-08-14 | 10 | 0 | 0 | 34 | 0 | 12/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 14 | — | 3,568 | 100 |
| SURFACE | 10 | 32 | — | 100 | 0 |
Location
35.042820, -96.880100
35.04282, -96.88010 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.