TJ COLEMAN (EAST COLEMAN 1) #1
API 3512503559 · Pottawatomie County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1938-10-20
Drilling finished
1938-11-09
Completed
1938-11-10
Recompleted
1975-01-01
First production
1938-11-18
Total depth
4,081 ft
Operator
CONSOLIDATED PRODUCTION INC.
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| MISENER-HUNTON | OIL | 3,870–3,880 |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1975-01-01 | 1 | 5 | 25 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 24 | — | 4,050 | 125 |
| SURFACE | 12 1/2 | 45 | — | 90 | 80 |
Location
35.040778, -96.786242
35.04078, -96.78624 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom