R. B. #2
API 3512522065 · Pottawatomie County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 21,514 | 0 |
| Nov 2025 | 20,820 | 0 |
| Oct 2025 | 21,514 | 0 |
| Sep 2025 | 20,820 | 0 |
| Aug 2025 | 21,514 | 0 |
| Jul 2025 | 21,514 | 0 |
| Jun 2025 | 20,820 | 0 |
| May 2025 | 21,514 | 0 |
| Apr 2025 | 20,839 | 0 |
| Mar 2025 | 21,373 | 0 |
| Feb 2025 | 19,436 | 0 |
| Jan 2025 | 21,370 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2DNCInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SIMPSON DOLOMITE | DISP | 4,083–4,114 | Acid |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 | API | 4,280 | 150 |
| SURFACE | 10 3/4 | — | API | 696 | 300 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 4 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-10-23
WRARCStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SIMPSON DOLO | 4,080 |
| WILCOX | 4,240 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2015-05-01
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| SIMPSON DOLO | 4,080 |
| WILCOX | 4,240 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.042931, -96.798774
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.