SWARTZ #2-84-1
API 3512522216 · Pottawatomie County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 1
STRAIGHT HOLEACOILSpudded
1984-05-18
Drilling finished
1984-05-27
Completed
1984-06-14
First production
1984-06-15
Total depth
4,225 ft
Operator
LAIRD BILL OIL COMPANY
Intervals
| Formation | Produced | Top (ft) | Perforated (ft) | Treatment |
|---|---|---|---|---|
| EARLSBORO | OIL | 3,250 | 3,260–3,270 | Acid |
| HUNTON | OIL | 3,590 | 3,680–3,690 | Acid |
| SIMPSON DOLO | OIL | 4,140 | 4,150–4,160 | Acid |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1984-06-15 | 5 | 0 | 0 | 39 | 0 | — |
| 1984-06-15 | 5 | 0 | 20 | 39 | 0 | — |
| 1984-06-15 | 10 | 0 | 60 | 39 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,220 | 300 |
| SURFACE | 8 5/8 | 24 | J-55 | 460 | 350 |
Location
35.069810, -96.836570
35.06981, -96.83657 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.