SPS #1-26
API 3512523662 · Pottawatomie County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| MISENER/HUNTON | OIL | 4,038–4,148 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2009-07-24 | 22 | 40 | 20 | 40 | 350 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J55 | 4,215 | 150 |
| SURFACE | 8 5/8 | 24 | — | 174 | 125 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 5 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2009-06-03
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| EARLSBORO | 3,650 |
| MISENER-HUNTON | 4,160 |
| VIOLA | 4,300 |
| SIMPSON DOLO | 4,380 |
| WILCOX | 4,450 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.142876, -96.854230
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.