HUNTON #17-3
API 3512523775 · Pottawatomie County, Oklahoma
Completion
Oklahoma files 1 completion report for this well.
Completion 1
DIRECTIONAL HOLEACOILIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HUNTON | OIL | 4,556–4,576 | Acid, Frac |
| VIOLA | DRY | 4,694–4,698 | Acid, Frac |
| 2ND WILCOX | DRY | 4,892–4,895 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5.5 | 15.5 | J-55 | 4,920 | 375 |
| SURFACE | 8.625 | 24 | J-55 | 1,100 | 635 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 13 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2012-06-20
WRADRDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| EARLSBORO | 3,800 |
| MISENER | 4,000 |
| HUNTON | 4,030 |
| VIOLA | 4,140 |
| WILCOX 1 | 4,260 |
| WILCOX 2 | 4,325 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Application
REJAMDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| EARLSBORO | 3,800 |
| MISENER | 4,000 |
| WILCOX 1 | 4,260 |
| WILCOX 2 | 4,325 |
| HUNTON | 4,550 |
| VIOLA | 4,600 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Application
REJRCDirectional holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| EARLSBORO | 4,052 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.165317, -96.795215
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.