WYATT #1-4
API 3512523937 · Pottawatomie County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEPAOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| WILCOX | OIL | 4,249–4,251 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2019-02-05 | 6 | 0 | 90 | 40 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | — | — | 4,346 | 125 |
| CONDUCTOR | 12 1/4 | — | — | — | 0 |
| SURFACE | 8 5/8 | — | — | 1,073 | 600 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 9 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2018-07-27
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| WEWOKA | 2,400 |
| CALVIN | 2,800 |
| EARLSBORO | 3,500 |
| MAYES | 3,700 |
| WOODFORD | 3,810 |
| HUNTON | 4,000 |
| VIOLA | 4,140 |
| SIMPSON DOLO | 4,210 |
| WILCOX | 4,240 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.198304, -96.779504
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.