LYNX #1
API 3512523964 · Pottawatomie County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| EARLSBORO | OIL | 3,154–3,160 | Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2023-08-01 | 40 | 0 | 0 | 28.4 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 3,980 | 280 |
| SURFACE | 8 5/8 | 24 | J-55 | 452 | 250 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2022-04-20
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| PENNSYLVANIA UP | 2,300 |
| CALVIN | 3,045 |
| SENORA | 3,115 |
| EARLSBORO | 3,180 |
| MISENER | 3,200 |
| HUNTON | 3,300 |
| VIOLA | 3,575 |
| SIMPSON DOLO | 3,750 |
| WILCOX 1 | 3,775 |
| WILCOX 2 | 4,070 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.948498, -96.882129
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.