BRAUM FARMS #2-8
API 3512523986 · Pottawatomie County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 9,770 | 900 |
| Nov 2025 | 6,105 | 900 |
| Oct 2025 | 7,420 | 750 |
| Sep 2025 | 6,455 | 800 |
| Aug 2025 | 6,860 | 700 |
| Jul 2025 | 6,290 | 700 |
| Jun 2025 | 5,693 | 700 |
| May 2025 | 931 | 500 |
| Apr 2025 | 0 | 0 |
| Mar 2025 | 0 | 0 |
| Feb 2025 | 0 | 0 |
| Jan 2025 | 0 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
AC2DNCInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SIMPSON | SVC | 4,440–4,470 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,546 | 160 |
| CONDUCTOR | 20 | — | — | 40 | 0 |
| SURFACE | 8 5/8 | 24 | J-55 | 250 | 200 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 7 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2024-09-05
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| BELLE CITY | 2,397 |
| HOGSHOOTER | 2,717 |
| LAYTON | 2,769 |
| CLEVELAND | 2,919 |
| HUNTON | 3,534 |
| VIOLA | 3,727 |
| SIMPSON | 3,900 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.919747, -97.004317
Every well in Pottawatomie County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.