MIDWAY SWD #1-36
API 3512923527 · Roger Mills County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 542,845 | 1,650 |
| Nov 2025 | 485,405 | 1,700 |
| Oct 2025 | 376,554 | 1,550 |
| Sep 2025 | 407,385 | 1,425 |
| Aug 2025 | 372,863 | 1,400 |
| Jul 2025 | 212,846 | 1,150 |
| Jun 2025 | 277,573 | 1,350 |
| May 2025 | 302,122 | 1,300 |
| Apr 2025 | 241,431 | 1,350 |
| Mar 2025 | 147,116 | 1,300 |
| Feb 2025 | 113,769 | 1,050 |
| Jan 2025 | 134,743 | 1,050 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEAC2DCmInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| BROWN DOLOMITE | COMM DISP | 4,255–4,900 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 26 | J-55 | 4,991 | 700 |
| CONDUCTOR | 20 | 64 | — | 79 | 10 |
| SURFACE | 9 5/8 | 36 | J-55 | 804 | 450 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-06-08
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| BROWN DOLOMITE | 4,100 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.733120, -99.924040
Every well in Roger Mills County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.