BETHEL #4
API 3513312087 · Seminole County, Oklahoma
ACOIL
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILSpudded
1926-06-01
Drilling finished
1926-09-03
Completed
1926-09-03
First production
1926-09-03
Total depth
3,303 ft
Operator
CIRCLE 9 RESOURCES LLC
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 1926-09-03 | 75 | 0 | 0 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| CONDUCTOR | 20 | — | — | 182 | 0 |
| INTERMEDIATE | 8 1/4 | — | — | 2,085 | 0 |
| PRODUCTION | 6 58 | — | — | 3,278 | 0 |
| SURFACE | 15 1/2 | — | — | 657 | 0 |
Location
35.272657, -96.495554
35.27266, -96.49555 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Seminole County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.