RODDEN #1

API 3513320095 · Seminole County, Oklahoma

AC2DNC
API
3513320095
Operator
BILLY JACK SHARBER OPERATING LLC
County
Seminole

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2DNC
Injection zone
ARBUCKLE|MCLISH-OIL CREEK
Cumulative fluid injected
0 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202500
Nov 202500
Oct 202500
Sep 202500
Aug 202500
Jul 202500
Jun 202500
May 202500
Apr 202500
Mar 202500
Feb 202500
Jan 202500

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 3

STRAIGHT HOLEAC2DNC
Spudded
1966-12-29
Drilling finished
1967-01-15
Completed
1967-02-15
Recompleted
2014-01-30
First production
1967-02-16
Total depth
4,792 ft
Operator
BILLY JACK SHARBER OPERATING LLC

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION724—3,723400
SURFACE10 3/4328RD384300

Drilling permit

Oklahoma files 1 application to drill this well, naming 3 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 1991-09-05

WRARE
Permit API
35133200950001
Operator
THOMAS J L ENGINEERING INC
Well type
2DNC
Approved
1991-09-05
Expires
1992-03-19
Proposed depth
5,200 ft
Surface casing
374 ft
Ground elevation
934 ft

Target formations

FormationExpected top (ft)
MCLISH4,015
OIL CREEK4,235
ARBUCKLE4,552

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

34.988140, -96.660030

34.98814, -96.66003 · Surface location as filed with Oklahoma

Every well in Seminole County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.