COWPOKE #1-28
API 3513324839 · Seminole County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| HUNTON | OIL | 4,010–4,145 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2010-03-31 | 150 | 187 | 232 | 42 | 805 | OPEN |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | J-55 | 4,249 | 200 |
| SURFACE | 8 5/8 | 24 | J-55 | 720 | 375 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2009-10-20
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CALVIN | 1,075 |
| SENORA | 1,600 |
| RED FORK | 2,100 |
| BARTLESVILLE | 2,650 |
| BOOCH | 2,750 |
| HARTSHORNE | 2,825 |
| GILCREASE | 3,000 |
| HUNTON | 3,920 |
| MISENER | 3,940 |
| VIOLA | 4,125 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.131171, -96.461128
Every well in Seminole County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.