CLUCK A #16
API 3513325046 · Seminole County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 49,500 | 325 |
| Nov 2025 | 44,884 | 325 |
| Oct 2025 | 40,120 | 325 |
| Sep 2025 | 11,600 | 325 |
| Aug 2025 | 45,588 | 325 |
| Jul 2025 | 44,237 | 325 |
| Jun 2025 | 43,250 | 325 |
| May 2025 | 49,360 | 325 |
| Apr 2025 | 45,900 | 325 |
| Mar 2025 | 52,100 | 325 |
| Feb 2025 | 44,165 | 400 |
| Jan 2025 | 50,577 | 400 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEAC2DNCIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| 1ST WILCOX | OIL | 4,180–4,182 | Acid |
| 2ND WILCOX | DRY | 4,308–4,312 | Acid |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2012-07-03 | 3 | 0 | 850 | 41 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 15.5 | J-55 | 4,385 | 375 |
| CONDUCTOR | 8 5/8 | 24 | J-55 | 245 | 220 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 11 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2013-05-03
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CALVIN | 2,870 |
| EARLSBORO | 3,415 |
| PENNSYLVANIA UNCONF BAS SD | 3,520 |
| WOODFORD | 3,840 |
| HUNTON | 3,970 |
| FERNVALE | 4,070 |
| VIOLA | 4,120 |
| WILCOX 1 | 4,175 |
| MARSHALL DOLO | 4,235 |
| WILCOX 2 | 4,265 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2015-12-31
WRADPStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| MCLISH | 4,600 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.179409, -96.744743
Every well in Seminole County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.