E MEHAGAN #1-3
API 3513325251 · Seminole County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SIMPSON DOLOMITE | OIL | 4,223–4,226 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2017-11-05 | 5 | 0 | 400 | 38 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7" | 23# | — | 4,348 | 100 |
| SURFACE | 9-5/8" | 32.3# | — | 1,320 | 650 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 7 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2017-07-28
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CALVIN | 2,970 |
| EARLSBORO | 3,550 |
| VIOLA | 4,170 |
| SIMPSON DOLO | 4,230 |
| WILCOX 1 | 4,250 |
| MARSHALL DOLO | 4,290 |
| WILCOX 2 | 4,340 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.276478, -96.762197
Every well in Seminole County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.