BOZ #1-35
API 3513325264 · Seminole County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 122,748 | 125 |
| Nov 2025 | 159,126 | 125 |
| Oct 2025 | 163,532 | 125 |
| Sep 2025 | 157,200 | 125 |
| Aug 2025 | 181,057 | 125 |
| Jul 2025 | 177,912 | 125 |
| Jun 2025 | 170,890 | 125 |
| May 2025 | 134,182 | 125 |
| Apr 2025 | 183,004 | 125 |
| Mar 2025 | 179,873 | 125 |
| Feb 2025 | 79,554 | 125 |
| Jan 2025 | 155,031 | 125 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEAC2DNCIntervals
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| SIMPSON | DRY | 4,085–4,087 | Acid, Frac |
| FIRST WILCOX | DRY | 4,104–4,106 | Acid, Frac |
Production tests
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2017-12-21 | 0 | 0 | 960 | — | 0 | — |
| 2018-01-02 | 0 | 0 | 700 | — | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7" | 23# | — | 4,265 | 100 |
| SURFACE | 9 5/8" | 32.3# | — | 929 | 450 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 20 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2017-11-22
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CALVIN | 1,940 |
| BOOCH | 3,135 |
| GILCREASE | 3,160 |
| CROMWELL | 3,180 |
| HUNTON | 3,935 |
| VIOLA | 4,000 |
| SIMPSON DOLO | 4,070 |
| WILCOX 1 | 4,090 |
| MARSHALL DOLO | 4,145 |
| WILCOX 2 | 4,170 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2017-11-22
WRAAMStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CALVIN | 1,940 |
| BOOCH | 3,135 |
| GILCREASE | 3,160 |
| CROMWELL | 3,180 |
| HUNTON | 3,935 |
| VIOLA | 4,000 |
| SIMPSON DOLO | 4,070 |
| WILCOX 1 | 4,090 |
| MARSHALL DOLO | 4,145 |
| WILCOX 2 | 4,170 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.117640, -96.635920
Every well in Seminole County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.