CLINT SULLINGER #1-35
API 3513325277 · Seminole County, Oklahoma
Completion
Oklahoma files 1 completion report for this well. One carries a production test the operator filed.
Completion 0
STRAIGHT HOLEACOILInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| FIRST WILCOX | OIL | 4,090–4,092 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2018-05-12 | 8 | 0 | 1,200 | 38 | 0 | — |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | — | — | 4,230 | 100 |
| SURFACE | 9 5/8 | — | — | 1,071 | 500 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 10 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2018-01-10
WRADRStraight holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CALVIN | 1,940 |
| BOOCH | 3,135 |
| GILCREASE | 3,160 |
| CROMWELL | 3,180 |
| HUNTON | 3,935 |
| VIOLA | 4,000 |
| SIMPSON DOLO | 4,070 |
| WILCOX 1 | 4,090 |
| MARSHALL DOLO | 4,145 |
| WILCOX 2 | 4,170 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
35.129556, -96.637562
Every well in Seminole County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.