SHOLEM ALECHEM FAULT BLOCK A UNIT (W.T.HUMPHREY 8) #193
API 3513702580 · Stephens County, Oklahoma
PAOIL
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEPAOILSpudded
1950-03-09
Drilling finished
1950-04-04
Completed
1950-04-19
First production
1950-04-12
Total depth
5,155 ft
Operator
CITATION OIL & GAS CORP
Interval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| SIMS | OIL | 4,886–5,108 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 | J55 | 5,141 | 425 |
| SURFACE | 10 3/4 | 40.5 | S40/R3 | 363 | 225 |
Location
34.487870, -97.587650
34.48787, -97.58765 · Surface location as filed with Oklahoma⌘ or Ctrl + scroll to zoom
Every well in Stephens County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.