EBI #1-7
API 3513726000 · Stephens County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well. One carries a production test the operator filed.
Completion 3
ACGASCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| — | — | — | — | — | 0 |
Completion 3
DIRECTIONAL HOLEACGASInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| CISCO | GAS | 5,060–6,198 | Acid, Frac |
Production test
| Tested | Oil (bbl/d) | Gas (MCF/d) | Water (bbl/d) | Gravity (°API) | Shut-in (psi) | Choke |
|---|---|---|---|---|---|---|
| 2019-10-18 | 2 | 948 | 4 | 46.8 | 1,900 | 64/64 |
A production test is one measurement the operator made on one day and filed with Oklahoma. It is not a monthly average and it does not describe how the well produced afterwards. The choke size is shown exactly as filed: Oklahoma records it in inches on some reports and in sixty-fourths of an inch on others, and names the unit on neither. A dash is a measurement Oklahoma did not file, or one it filed outside any physically possible range.
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| INTERMEDIATE | 9 5/8 | 47 | P110 | 10,900 | 1,600 |
| PRODUCTION | 5 1/2 | 20/23 | P110 | 14,960 | 1,150 |
| SURFACE | 13 3/8 | 54.5 | J55 | 1,515 | 1,300 |
Drilling permits
Oklahoma files 3 applications to drill this well, naming 11 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2003-10-21
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| CISCO | 6,000 |
| HOXBAR UP | 9,850 |
| HOXBAR LOW | 10,650 |
| DEESE | 12,000 |
| DORNICK HILLS | 13,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2003-10-29
WRAAMTarget formations
| Formation | Expected top (ft) |
|---|---|
| CISCO | 6,000 |
| HOXBAR UP | 9,850 |
| HOXBAR LOW | 10,650 |
| DEESE | 12,000 |
| DORNICK HILLS | 13,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2008-02-21
WRARCDirectional holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| CISCO | 5,800 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.654334, -97.981370
Every well in Stephens County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.