SARAH #2-27
API 3513726030 · Stephens County, Oklahoma
Completions
Oklahoma files 2 completion reports for this well.
Completion 4
ACGASCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| — | — | — | — | — | 0 |
Completion 4
DIRECTIONAL HOLEACGASCasing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 5 1/2 | 17 | P-110 | 11,930 | 0 |
| SURFACE | 9 5/8 | 36 | K-55 | 1,476 | 665 |
Drilling permits
Oklahoma files 4 applications to drill this well, naming 27 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2004-01-16
WRADRTarget formations
| Formation | Expected top (ft) |
|---|---|
| CISCO | 4,300 |
| HOXBAR 1 | 6,350 |
| HOXBAR 2 | 7,600 |
| DEESE 1 | 9,300 |
| DEESE 2 | 9,600 |
| DEESE 3 | 10,000 |
| DORNICK HILLS UP | 10,600 |
| DORNICK HILLS LOW 1 | 11,300 |
| DORNICK HILLS LOW 2 | 11,500 |
| SPRINGER 1 | 11,900 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2005-04-14
WRARCTarget formations
| Formation | Expected top (ft) |
|---|---|
| HOXBAR 1 | 6,510 |
| HOXBAR 2 | 7,810 |
| DEESE 1 | 8,148 |
| DEESE 2 | 8,301 |
| DORNICK HILLS UP | 10,723 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2009-10-20
WRARCDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CISCO | 4,984 |
| HOXBAR 1 | 6,510 |
| HOXBAR 2 | 7,810 |
| DEESE 1 | 8,148 |
| DEESE 2 | 8,301 |
| DORNICK HILLS UP | 10,723 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2012-09-25
WRARCDirectional holeTarget formations
| Formation | Expected top (ft) |
|---|---|
| CISCO | 4,984 |
| HOXBAR 1 | 6,580 |
| HOXBAR 2 | 7,408 |
| DEESE 1 | 8,148 |
| DEESE 2 | 8,652 |
| DORNICK HILLS UP | 10,862 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.612964, -97.815549
Every well in Stephens County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.