MILROY DEESE UNIT #14-11

API 3513726182 · Stephens County, Oklahoma

AC2RIn
API
3513726182
Operator
CITATION OIL & GAS CORP
County
Stephens

Injection

12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.

Oklahoma well-type code
2RIn
Injection zone
DEESE
Cumulative fluid injected
173,173 bbl
MonthFluid injected (bbl)Max pressure (psi)
Dec 202514,3291,500
Nov 202515,2661,500
Oct 202516,4591,500
Sep 202515,2481,500
Aug 202516,2991,500
Jul 202517,1811,500
Jun 202514,4951,500
May 202513,1031,500
Apr 202512,8241,500
Mar 202513,5011,500
Feb 202511,3651,500
Jan 202513,1031,500

A dash is a month the well filed with no figure in that column.

Completion

Oklahoma files 1 completion report for this well.

Completion 2

STRAIGHT HOLEAC2RIn
Spudded
2005-04-05
Drilling finished
2005-04-12
Completed
2005-05-05
Recompleted
2010-10-18
First production
2005-05-05
Total depth
3,770 ft
Operator
CITATION OIL & GAS CORP

Interval

FormationProducedPerforated (ft)Treatment
MILROY DEESEINJ2,396–3,430Acid

Casing

StringSize (in)Weight (lb/ft)GradeSet (ft)Cement (sacks)
PRODUCTION5 1/215.5J-553,768440
SURFACE8 5/824J-55313250

Drilling permit

Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.

Filed 2005-01-13

WRADR
Permit API
35137261820000
Operator
LE NORMAN PARTNERS LLC
Well type
2RIn
Approved
2005-01-13
Expires
2005-07-13
Proposed depth
3,600 ft
Surface casing
310 ft
Ground elevation
1,108 ft

Target formation

FormationExpected top (ft)
DEESE MILROY1,740

An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.

Location

34.374546, -97.597191

34.37455, -97.59719 · Surface location as filed with Oklahoma

Every well in Stephens County, Oklahoma

Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.