ROYAL LOCO SAND UNIT #Y-56
API 3513726797 · Stephens County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 12,060 | 400 |
| Nov 2025 | 12,000 | 400 |
| Oct 2025 | 12,060 | 400 |
| Sep 2025 | 13,590 | 400 |
| Aug 2025 | 13,000 | 400 |
| Jul 2025 | 15,156 | 400 |
| Jun 2025 | 13,282 | 400 |
| May 2025 | 12,742 | 400 |
| Apr 2025 | 10,140 | 400 |
| Mar 2025 | 19,680 | 380 |
| Feb 2025 | 18,800 | 380 |
| Jan 2025 | 24,560 | 380 |
A dash is a month the well filed with no figure in that column.
Completions
Oklahoma files 2 completion reports for this well.
Completion 0
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| LOCO SD | INJ | 931–1,018 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4.5 | 10.5 | J-55 | 1,117 | 200 |
Completion 0
STRAIGHT HOLEAC2RInInterval
| Formation | Produced | Perforated (ft) | Treatment |
|---|---|---|---|
| LOCO | INJ | 931–1,018 | Acid, Frac |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 4 1/2 | 10.5 | J-55 | 1,117 | 200 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2011-05-10
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| LOCO | 920 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.301077, -97.681556
Every well in Stephens County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.