ABBY REESE #1
API 3513727405 · Stephens County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 1,744 | 0 |
| Nov 2025 | 1,706 | 0 |
| Oct 2025 | 1,948 | 0 |
| Sep 2025 | 255 | 0 |
| Aug 2025 | 947 | 0 |
| Jul 2025 | 779 | 0 |
| Jun 2025 | 1,154 | 0 |
| May 2025 | 1,522 | 0 |
| Apr 2025 | 2,115 | 0 |
| Mar 2025 | 1,872 | 0 |
| Feb 2025 | 898 | 0 |
| Jan 2025 | 1,315 | 0 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 1
STRAIGHT HOLEAC2DCmInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| PONTOTOC | COMM DISP | 2,120–2,446 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | 23 & 26 | — | 2,813 | 350 |
| SURFACE | 9 5/8 | 36 | — | 591 | 250 |
Drilling permits
Oklahoma files 2 applications to drill this well, naming 2 target formations. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2015-01-12
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| PONTOTOC | 2,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Filed 2015-01-12
WRAAMStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| PONTOTOC | 2,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.446750, -97.614040
Every well in Stephens County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.