BULLET ENERGY #3 SWD
API 3513727620 · Stephens County, Oklahoma
Injection
12 monthly filings with Oklahoma, Jan 2025 to Dec 2025.
| Month | Fluid injected (bbl) | Max pressure (psi) |
|---|---|---|
| Dec 2025 | 60,796 | 300 |
| Nov 2025 | 116,115 | 300 |
| Oct 2025 | 109,981 | 300 |
| Sep 2025 | 143,922 | 300 |
| Aug 2025 | 137,253 | 300 |
| Jul 2025 | 90,862 | 300 |
| Jun 2025 | 69,841 | 300 |
| May 2025 | 77,267 | 300 |
| Apr 2025 | 182,987 | 300 |
| Mar 2025 | 163,703 | 300 |
| Feb 2025 | 118,980 | 300 |
| Jan 2025 | 92,763 | 300 |
A dash is a month the well filed with no figure in that column.
Completion
Oklahoma files 1 completion report for this well.
Completion 0
STRAIGHT HOLEAC2DCmInterval
| Formation | Produced | Perforated (ft) |
|---|---|---|
| ALDRIDGE | COMM DISP | 5,082–5,882 |
Casing
| String | Size (in) | Weight (lb/ft) | Grade | Set (ft) | Cement (sacks) |
|---|---|---|---|---|---|
| PRODUCTION | 7 | — | — | 5,985 | 850 |
| SURFACE | 9.625 | — | — | 670 | 225 |
Drilling permit
Oklahoma files 1 application to drill this well, naming 1 target formation. A permit records what an operator asked to do, not what it did. A target formation is where the operator aimed, and the hole may have missed it, stopped short of it or never been drilled.
Filed 2021-03-04
WRADRStraight holeTarget formation
| Formation | Expected top (ft) |
|---|---|
| ALDRIDGE | 5,000 |
An expected top is the depth the operator predicted before drilling, on the application it filed with Oklahoma. It is not a measurement of where the formation was found.
Location
34.443277, -97.610608
Every well in Stephens County, Oklahoma
Oklahoma state record, from OK_wells_rbdms-wells.parquet. Corpus built 2026-09-11.